eCite Digital Repository

Uncertainty estimation of a CFD-methodology for the performance analysis of a collective and cyclic pitch propeller

Citation

Dubois, A and Leong, ZQ and Nguyen, HD and Binns, JR, Uncertainty estimation of a CFD-methodology for the performance analysis of a collective and cyclic pitch propeller, Applied Ocean Research, 85 pp. 73-87. ISSN 0141-1187 (2019) [Refereed Article]


Preview
PDF (Preprint version)
2Mb
  

Copyright Statement

Copyright 2019 Elsevier Ltd.

DOI: doi:10.1016/j.apor.2019.01.028

Abstract

Estimation and analysis of the uncertainty introduced by using a numerical model for the investigation and study of any type of flow problem have become common industry practice. Through understanding and evaluation of the uncertainty introduced by a numerical model, the accuracy and applicability of the model itself are evaluated. In this paper, the numerical uncertainty of a CFD-methodology developed to analyse the hydrodynamic performance of a collective and cyclic pitch propeller (CCPP) is estimated and analysed. The CCPP is a novel propulsion and manoeuvring concept for autonomous underwater vehicles, aimed to generate both propulsion and manoeuvring forces through advanced control of the propeller's blade pitch. The numerical uncertainty is established for three performance parameters, the generated propulsive force, the side-force magnitude, and the side-force orientation, by conducting a grid and time-step refinement study over three operational conditions. Additionally, the influence of the oscillatory uncertainty, introduced by the periodic nature of the problem, is investigated although shown to have a minimal effect when properly monitored. Based on a least-squares regression analysis of the refined simulation results, the numerical uncertainty is proven to be dominated by the introduced discretisation errors. In the case of the propulsive and side-force magnitude, the total uncertainty is dictated by the time discretisation uncertainty under bollard pull conditions, while the total uncertainty of the captive cases is mainly a result of the spatial discretisation uncertainty. The total uncertainty in the side-force orientation is observed to be primarily a consequence of the time discretisation uncertainty for all simulated cases. Overall, the total uncertainty for captive cases can be considered satisfactory for all three performance parameters, while further work is needed to reduce the observed uncertainty of the simulations under bollard pull conditions.

Item Details

Item Type:Refereed Article
Keywords:Numerical uncertainty, CFD, Collective and cyclic pitch propeller
Research Division:Engineering
Research Group:Maritime Engineering
Research Field:Ocean Engineering
Objective Division:Expanding Knowledge
Objective Group:Expanding Knowledge
Objective Field:Expanding Knowledge in Engineering
UTAS Author:Dubois, A (Mr Arno Dubois)
UTAS Author:Leong, ZQ (Dr Zhi Leong)
UTAS Author:Nguyen, HD (Dr Hung Nguyen)
UTAS Author:Binns, JR (Professor Jonathan Binns)
ID Code:130978
Year Published:2019
Deposited By:NC Maritime Engineering and Hydrodynamics
Deposited On:2019-02-25
Last Modified:2019-04-16
Downloads:5 View Download Statistics

Repository Staff Only: item control page